Home
Portfolio
About Us
Contact
NiComTech
Providing exellent service
NiComTech
History
Mission
Community
Investing in People
Solutions
FAQ
Your global partner


Solutions




ASSOCIATIONS
  • Council of Registered Engineers of Nigeria (COREN)
  • Nigerian Society of Engineers

  • Nigerian Association of Consulting Engineers

  • Nigerian Standards Bureau

  • Nigerian Federation of Civil Engineering

  • Nigerian Institute of Civil Engineers

  • Nigerian Institute of Town and Regional Planners
TECHNICAL INNOVATIONS
  • Standardized Tower Designs

  • Generic Peripherals

  • Detailed Cost Analyses

  • Standardized Fencing and Containers

  • Innovative and Environmentally Friendly Foundation Designs

  • Total Configuration Management of all Documents

  • Advanced IT Systems
IT SYSTEMS

NiComTech uses state-of-the-art IT systems in the management and delivery of services. Read / Write access can be provided to clients so they can generate their own reports and track the progress of the projects. This service is unique in the industry. By using the advantages of the Internet, NiComTech can provide real-time quality project management throughout all of Africa and the world.

QUALITY CONTROL

NiComTech maintains strict quality control of all projects from inception to final delivery.

  • Comprehensive fabrication inspections with all material manufacturers

  • Continuous inspection and approval of all activities during the construction phases

  • Strict compliance with industry standards

  • Nigerian Regulations

  • Financial and Cost Control
5 CRITICAL KEYS

The 5 Critical Keys to Evaluating NiComTech are:
  • Technical
  • Total Quality Management

  • Economic Empowerment

  • Due Diligence

  • Commercial
TURN-KEY SOLUTION

NiComTech proposes a complete turn-key solution for the provision of communication network infrastructure. Serving as the Master Contractor, NiComTech can deliver a quality product that offers a substantial cost and time benefit to the Network Operator. From receipt of Executable File to Final Delivery and Acceptance, this one-stop service offers the best approach to establishing or expanding a network.

TURN-KEY SERVICES
  • Project Funding

  • Environmental Impact Studies

  • Procurement

  • Contract Management

  • Construction Management

  • Equipment Installation and Commissioning

  • Electrical Power Supply

  • Maintenance
TURNKEY PROPOSAL

NiComTech will serve as the Master Contractor for the Rollout Project and provide the following services:
  • Environmental Impact Studies

  • Procure Materials

  • Civil Construction

  • Electrical Power Supply

  • Project Funding (Short/Long Term)
PROPOSAL STEPS

From the date NiComTech receives a “complete” Exe File with a RFQ date it will:
  • Appoint the Contractors/Handover Site

  • Manage all Material Delivery to Site

  • Manage the Civil and Elec Construction

  • Perform QA Inspections

  • Provide the Electrical Power Supply

  • Present Finished Site, with Power, by the RFQ Date for Acceptance
ACCEPTANCE PROCESS
  • Pre-Acceptance Inspection (NiComTech/Contractors)

  • Compile As-Built Documentation

  • Acceptance Inspection (Operator/NiComTech/Contractors)

  • Acceptance Certificate Signed
AFTER ACCEPTANCE CERTIFICATE IS SIGNED
  • Pay all Contractor Invoices

  • Submit Detailed Invoice to Network Operator (typical payment terms of 30 days)

  • Provide Operator a Guarantee of Quality and Workmanship for a Period of 180 Days or a period to be agreed upon
PROPOSED PILOT PROJECT

NiComTech proposes to select one project for a turnkey pilot. Proposed criteria include:
  • Minimum Ten Sites

  • Central or Northern Region

  • Procure Materials from Operator's Stock

  • Self-Build Electrical Power
CONCLUSION

  NiComtech – Cost effective and efficient Supplier connecting you to the world.

NiComTech is totally committed to providing world-class quality service to its customers.
  back to top